Do I need to migrate the entire environment at once?
No. Hybrid coexistence can be planned, with migration by application group. Sequencing depends on integrations, connectivity and the transition plan. Each stage must include technical validation and acceptance by the system owner. Source: architecture guidance.
When should I choose Compute Engine, GKE or Cloud Run?
Compute Engine offers control over the VM; GKE supports Kubernetes orchestration; Cloud Run simplifies the execution of supported services and tasks. The best fit depends on the application, operational requirements and team experience. Sources: Compute Engine, GKE, Cloud Run.
Does BigQuery replace my ERP database?
That replacement must not be assumed. BigQuery supports analytics; a transactional application needs a database compatible with its requirements. Integration can bring operational data into analytics, with defined governance and frequency. Sources: BigQuery, Cloud SQL.
Can I keep data in Brazil?
Eligible services can be configured in specific locations, including resources available in São Paulo. The assessment must cover primary data, replicas, backups, logs and applicable terms. There is no universal answer for the entire portfolio. Source: services with data residency.
Does a dedicated connection already include encryption?
Cloud Interconnect does not encrypt by default. If the project requires cryptographic protection of the link, a compatible solution must be selected and configured, considering the full path and the responsibilities involved. Source: Interconnect traffic protection.
Does a budget alert prevent additional charges?
An alerts-only budget tracks consumption and notifies the responsible parties. It does not automatically impose a cap. Additional controls must be assessed per service, taking into account the potential effects of interrupting applications. Source: Google Cloud budgets.
Can I use licenses I already own?
This depends on the product, version, contracted rights and hosting model. Before migrating, eligibility and any requirement for dedicated resources must be validated. An existing license must not be assumed to be transferable automatically. Source: bring existing licenses.
How do I get started with ADD Solution?
The initial discussion should bring together priority systems, dependencies, current consumption and continuity objectives. This context makes it possible to define the engineering, deployment and operational scope, establish acceptance criteria and discuss improvements suited to the business.