Source & destination
Connected points, distances and areas.
Corporate backbones, data centers, industrial environments and high-capacity networks depend on optical infrastructure that can transport data with predictable performance and reliability.
Add Solution works across the entire cycle: assessment, design, cable installation, assembly, splicing, termination, organization, identification, testing, certification and documentation.
With qualified professionals and specialized instrumentation, we turn the physical installation into measured, validated infrastructure ready to support operations.
Executamos infraestrutura óptica com engenharia de rota, fusão, terminação, testes e certificação coerentes com a aplicação.

Arquitetura, execução e operação tratadas como partes da mesma responsabilidade.
A professional deployment connects design, routes, infrastructure, cable installation, placement, splices, terminations, identification, measurement, certification and documentation.
We do not deliver only a connected fiber. We deliver infrastructure whose condition can be measured, documented and validated.
Fiber is the medium. The design defines how it will support the network, considering application, capacity, topology, environment, expansion and interconnections.
Connected points, distances and areas.
Capacity, speed and transported services.
Architecture, interconnections and redundancy.
Characteristics aligned with the application and its evolution.
Paths, environment and physical protection.
Optical distribution frames, enclosures, connectors and organization.
Path contributions and required margin.
Identification, results and traceability.
OS1 and OS2 can serve different applications and distances depending on transceivers, standards, architecture, existing infrastructure and planned evolution.
OM3, OM4 and OM5 have specific applications. Speed, distance, transceivers and total cost must guide the decision, with no universal hierarchy among fiber types.
Fiber can support campuses, buildings, data centers, equipment rooms, industrial environments, distribution centers and corporate networks with capacity, scalability and immunity to electromagnetic interference.
Corporate Networks Industrial Networks Data CenterRoutes, conduits, cable trays, enclosures, placement, bend radius, pulling tension, mechanical protection, service loops and identification influence the link’s final condition.
Final performance also begins with how the cable was installed.
Optical distribution frames, enclosures, trays, pigtails, adapters, patch cords, service loops and identification support protection, maintenance, traceability, diagnostics and expansion.
Preparation, cleaving, splicing, protection, placement, organization, identification and validation must form a single execution process.
Making the splice is an operation. Measuring the result is engineering.
Cleaning, inspection when applicable, and proper handling of connectors, adapters and patch cords reduce the risk of loss and instability caused by contamination or damage.
Add Solution has instrumentation for measurement, analysis and certification according to the requirements, limits, methods and standards applicable to the project.
Characterizes events and behavior along the link.
Evaluates end-to-end optical loss using the applicable method.
Measures power and supports optical loss testing.
Performs fusion splices with appropriate preparation and protection.
An active link answers: communication exists. Certification answers: the link meets the defined criteria.
The Optical Time Domain Reflectometer helps identify and characterize connectors, splices, reflections, localized losses, bends in certain scenarios, breaks and distance to events.
It does not show continuity alone. It helps indicate where the link is losing performance.
Source, power meter, OLTS, insertion loss, wavelengths, reference and project limits enable end-to-end loss evaluation under the applicable method.
Different tools answer different questions.
Fiber, distance, connectors, splices, splitters when applicable, and other elements contribute to total loss. The system power budget must not be confused with the infrastructure loss limit.
Continuity asks whether a path exists. Measurement observes behavior and loss. Certification verifies whether results meet the criteria defined for the link, application and applicable standard.
Instrumentation makes it possible to investigate excessive loss, breaks, contamination, splices, bends, reflections, patching and physical degradation before intervention.
Measuring before intervening reduces trial and error.
Add Solution can address breaks, splices, replacements, reterminations, reorganization, expansion, branches, diagnostics and recertification according to scope.
Logical redundancy and physical diversity are different concepts. When availability requires redundant paths, routes and shared points must be analyzed.
Distances, electromagnetic interference, routes, protection, topology, redundancy and integration guide the use of fiber without making it mandatory in every scenario.
Industrial NetworksUplinks, backbones, storage networking where relevant, and connections between equipment and areas require design, organization and validation.
Data Center Servers & StorageDepending on scope, identification, maps, routes, source and destination, fibers, splices, terminations, results, reports and as-built documentation improve traceability, maintenance, diagnostics and expansion.
Add Solution has experience in distribution and logistics centers, hospitals, industrial facilities and companies across different sectors, respecting their specific physical and operational requirements.
Learn about the industries we serveWe can assess links, diagnose losses, locate events, verify terminations and take measurements to understand the actual condition of the infrastructure.
Request an assessmentQualified professionals, OTDR, OLTS, power meters, fusion splicers and specialized instrumentation to handle the full deployment and validation cycle.
Application, environment and requirements.
Topology, paths, fibers and terminations.
Infrastructure and materials.
Cable installation and placement.
Perform the required splices.
Organize optical distribution frames, enclosures and interfaces.
Analyze optical behavior.
Validate according to applicable criteria.
Record infrastructure and results.
Make the validated infrastructure available.
Certification and validation are conducted according to the requirements, limits, methods and standards applicable to the project. The technical equipment fleet includes instruments from different manufacturers.
Structured & Certified Cabling Technologies & ProductsRespostas objetivas para dúvidas técnicas e operacionais que costumam surgir antes de um projeto.
Não. Comunicação demonstra funcionalidade; certificação verifica resultados diante dos critérios e limites definidos para o projeto e aplicação.
Não. O OTDR caracteriza eventos ao longo do enlace. OLTS e power meter avaliam a perda óptica end-to-end conforme o método de teste.
Não. Aplicação, distância, velocidade, transceptores, infraestrutura existente, evolução e custo total orientam a escolha.
Sim. A atuação pode envolver emendas, reterminações, reorganização, expansão, diagnóstico, recuperação e recertificação conforme o escopo.
Não necessariamente. Se compartilham a mesma rota e os mesmos pontos de risco, podem continuar representando uma única dependência física.
A equipe dispõe de OTDR, OLTS, optical power meter, máquinas de fusão e instrumentação especializada de diferentes fabricantes para execução e validação.
Share the context of your environment, the perceived impacts and the results your organization seeks. Add Solution will direct the conversation to the most appropriate experts.